Safety
Taxiways B and M have experienced an increase in activity since the completion of the new terminal. The new Terminal configuration places more demand on these pavements. Taxiway B reconstruction from Taxiway Ml to Taxiway B2 is necessary to maintain safety and capacity on the airfield. In addition, the reconfiguration of the tenant ramp and road alignment at the approach end of RWY 31R are also necessary to prevent runway incursions in a congested section of the airfield; Taxiway M extension (Phase IV) will enhance capacity by extending Taxiway Man additional 1,800 linear feet from taxiway B4 to Taxiway D. The additional capacity is needed for the Runway 13R-31L reconstruction project in 2020.
Regulatory Requirement
Airfield improvements are needed at DAL because certain aspects of the airfield do not meet FAA design standards; for example the current "Y" shaped taxiway connectors between Taxiway B, M and Runway 13L-31R are not compliant with the current FAA requirements and this project will address this issue.
Purpose
TWY B Phase Ill will complete the reconstruction of TWY B. The pavement of TWY B was in poor condition and was in need of replacement. The pavement and associated connectors will be brought into the FAA's current design standards. Phase IV of this project will complete the construction of TWY M between TWY B4 and TWY BS, to improve the ground movements of aircraft and to eliminate operational issues during future projects.
Improvements
The project will completely improve and extend the pavement service life, improve the drainage system under the project area, improve the signage system within the project area.